Each of our houses were pre-constructed
almost 200 miles away and delivered on the backs of dump trucks
and then eased off the back of the trucks with two forklifts into
position.
This particular day was a real
treat for me as the Beach Houses I had designed were finally being
delivered for permanent installation.